Projects
Monarch’s funds are direct investments in communities by creating clean power, jobs and homes while providing predictable returns through the generation of federal and state tax credits. Here is a sample of recent projects and their economic impact.


The Grove
Mar 14, 2022
Stevens Point, Wisconsin
The Grove, located in Stevens Point, Wisconsin, was originally constructed in stages in 1901, 1915, and 1964 as a convent building. Now repurposed, it serves as a residential development. The […]


Shiloh Terrace
Feb 2, 2022
Windsor, California
Shiloh Terrace is a 134-unit affordable multifamily community in Windsor, California, offering two- and three-bedroom apartments for households earning at or below 70% of the Area Median Income. Each home […]


Keefer House Hotel
Dec 23, 2021
Hillsdale, Michigan
Keefer House Hotel, located in Hillsdale, Michigan, was originally built in 1885. Over the years, the building has been an integral part of Hillsdale’s hospitality industry, serving as a major […]


1202 Meridian
Dec 7, 2021
Indianapolis, Indiana
1202 Meridian was originally a vacant site that has been transformed into a dynamic mixed-use development. Located in Indianapolis, Indiana, the project includes 105 affordable studio, one-, and two-bedroom apartment […]


Badgerow Building
Nov 5, 2021
Sioux City, Iowa
The historic, 12-story Badgerow Building, located in downtown Sioux City, IA, was originally constructed in 1933 and is referred to as the ‘Monarch of the City’ due to its exterior […]


Assembly Solar III
Nov 5, 2021
Lennon, MI
This project has a capacity of 114 MW with a projected abatement of 3,624,741 MTCO2e over its expected 40-year operating life.


Bald Knob
Oct 29, 2021
Bald Knob, AR
This project has a capacity of 1 MW with a projected abatement of 30,628 MTCO2e over its expected 40-year operating life.


Bradford
Oct 29, 2021
Bradford, AR
This project has a capacity of 337 kW with a projected abatement of 10,753 MTCO2e over its expected 40-year operating life.


CA Library
Oct 29, 2021
Little Rock, AR
This project has a capacity of 1 MW with a projected abatement of 31,841 MTCO2e over its expected 40-year operating life.